Image above captured on the upper deck of the layout where scenery has progressed to some extent...
Shot with Olympus C-750

Welcome to the SP Oregon Division!

An N Scale RR depicting the good old days along "The Friendly".

Sunday, August 25, 2013

Penninsula Expansion Project Update

Sad to say, I am expanding the plywood prairie further before making much progress on the latest scenery project above Oakridge, but that is still moving forward...
Attention has moved to working on the next level of the expansion benchwork for Hampton, which will reside just above the staging yard. One revolution in the helix will be removed (between Natron and the climb to Oakridge), and in exchange trackage is being stretched out into the open on this new level with a reduced gradient.  This will reduce running time in the helix, including the addition of another long siding to improve flow across the layout, as well as adding another helper entrainment location.
Here is a view of the peninsula with the XtrakCad drawings laid out across the staging yard, used to verify benchwork dimensions of the new deck section as basic framework begins:

These drawings were printed out to lay out over the staging yard as I built the benchwork for the next level, then trimmed to fit as I relocated them up on top of the benchwork after completion.  They have helped immensely in being able to envision and move from each phase of benchwork and trackwork construction as I have progressed through this project.
So now with framework underway, the notching concept of each yard throat entering the staging yard can be seen.  This concept was developed by Ray early on when he was configuring the preliminary design work with XtrakCad.  This allows operators to have easy viewing of arriving and departing trains in staging, but is of minimal impact on space needed for the levles above.  A compressed version of the bridge crossing over Lookout Point Reservoir will reside between the helix and just above the K Falls staging entrance.  Klamath Falls staging is seen here, showing the XtrakCad drawings laid out for positioning of track alignment:

This week I completed cutting base roadbed for the track alignment, and am now working on the riser supports to maintain gradient.  Before I can begin construction on the upper deck, the backdrops will need to be added, also using masonite as intended for most other sections of the layout.  The staging perimeter will be wrapped with masonite and extend up to the top of the Hampton deck.  The final phase of this expansion project will be the Klamath Northern interchange on the upper deck.  This deck will reside in the center on top of the peninsula, but will be set back about a foot from the front of the Hampton deck with its own fascia, in an effort to divide each scene.
Latest progress showing an overall view with the Right of Way roadbed below, shows what the staging entrances now look like for Klamath Falls on the left, and Portland on the right.  Since this image was taken, the framing above Portland has been angled further back to reveal a bit more of the staging entrance:

Next up, cork, track, and trains...
Trackplan sketches have now been updated to reflect latest changes.

4 comments:

  1. Wow great job. Can't wait to see scenery on that!

    ReplyDelete
  2. Thanks David,
    Stop on by and we can get the scenery done twice as fast! :)
    Jeff

    ReplyDelete
  3. Looking good Jeff. The added operational interest and breaking up of the helix will add greatly to my experience. Thumbs up for sure.

    ReplyDelete
  4. Thanks John.
    Lost running time in a helix is a concession, but I would never trade the double deck operations potential of my current configuration in exchange. :)

    ReplyDelete