I have a Life Like SW1200 that has been working the layout all by itself for years. It wasn't until I bought a Micro Trains SW1500, that I realized what a masterpiece that SW1200 really was. They both use virtually the same mechanism, but with some added weight on the SW1200, it could pull like crazy as compared to its sibling SW1500.
Ray Eiser installed a decoder and added some Tungsten putty to the SW1200 (including front and rear headlights, and hardwired pick-up), before it ever went into service on the layout, so I never thought much about its pulling power. Once my new SW1500 arrived, I was really amazed at what a difference there was between the two. It has been on the to-do list to have a tug-o-war between the two and see just how much difference there was between them. I finally slapped together a couple vids and posted them on You Tube.
Check out the video links to see just what a little bit of extra weight can really do for your locomotive fleet!
You Tube- SW1500 vs SW1200 Tug-O-War
You Tube- SW1200 vs SD9 Tug-O-War
Image above captured on the upper deck of the layout where scenery has progressed to some extent...
Shot with Olympus C-750
Welcome to the SP Oregon Division!
An N Scale RR depicting the good old days along "The Friendly".
Shot with Olympus C-750
Welcome to the SP Oregon Division!
An N Scale RR depicting the good old days along "The Friendly".
Sunday, June 12, 2016
Saturday, April 16, 2016
Cascade Sub Layout Milestone:
Well, for those of you who feel like you are not making enough progress on your layout... you are not alone.
This April marks the 20th anniversary of layout construction here. Family comes first, but I sure enjoy this hobby. I told my wife way back when, that I would be done with the layout by 2016, and it is apparent there is still a lot of work ahead. A conventional single level linear layout would have been my first choice for ease of construction and walk-around design, but I am grateful to have been able to cram this multi-deck spaghetti bowl into our garage at all. For the most part it still retains mostly walk-around design features (with a few hiccups), but its configuration has swallowed significant labor hours as opposed to a more traditional linear design. Adding the peninsula to the layout was not part of the original plan (started back in 2011), so I tell myself I would still be on schedule otherwise (lol). At least now things are finally moving more to the scenery stages, so I am glad to have put the saws and drills away for the most part. Slow but steady progress has been, and still remains the norm.
Looking forward to sharing my progress as a layout host for SoCalOps 2016 in June.
This April marks the 20th anniversary of layout construction here. Family comes first, but I sure enjoy this hobby. I told my wife way back when, that I would be done with the layout by 2016, and it is apparent there is still a lot of work ahead. A conventional single level linear layout would have been my first choice for ease of construction and walk-around design, but I am grateful to have been able to cram this multi-deck spaghetti bowl into our garage at all. For the most part it still retains mostly walk-around design features (with a few hiccups), but its configuration has swallowed significant labor hours as opposed to a more traditional linear design. Adding the peninsula to the layout was not part of the original plan (started back in 2011), so I tell myself I would still be on schedule otherwise (lol). At least now things are finally moving more to the scenery stages, so I am glad to have put the saws and drills away for the most part. Slow but steady progress has been, and still remains the norm.
Looking forward to sharing my progress as a layout host for SoCalOps 2016 in June.
Crew Call Board
After seeing what Bill was using for a call board on his Southern Pacific Cascade Line, I realized what a good fit a magnet board was for operations here also. So I stole his idea and tweaked things a bit to conform how operations are handled on this end (Thanks Bill!). Hopefully this also makes life easier for the Crew Dispatcher. There are six columns configured in an attempt to help crews get a general overview of their next job. Typically trains are run by just an Engineer, but adding an option for a Conductor allows for unfamiliar operators to mark up with an engineer on mainline trains, and also for operators that like working as a two man crew for switch jobs. Train ID and lead Engine number columns help crews find their paperwork and consist at the corresponding yard office. The call-out Time is to work with the recently installed clocks on the wall (which are also for coordinating Work and Time with the dispatcher). I have incorporated the latter to spread out the sudden start-up of operations at the beginning of sessions (which has been neglected for so long). The departing station refers to the specific yard office where the orders and throttle are to be picked up by crew members.
Foam Base Scenery Progress
I have been slowly adding more pink Styrofoam around the layout to get a feel for the basic concepts and how it is all going to fit together. Static foam waste is entertaining stuff, so I am trying to get all the major pieces installed across the whole layout before moving forward on any other level of scenery. Still need to configure the foam closer to natural curvatures, but at least now I can see how this is all coming together. For some reason I don't' mind white plaster unfinished sections laying dormant for years at a time, but I think the pink foam will be a good motivator to hurry up and get er' done. I am already eager to get all this painted a brown earth color asap, but will have to revisit each section for final shaping before that ever happens. Maybe that can be the next phase of the project...
I am using mostly 2" foam board, but thanks again to Chip for helping to acquire some 1" foam, which has helped to speed up installation in many areas. Some foam sections have still been too thick to lay flush with the needed finish height due to framework, so slots have been carved out in the foam. This maintains a sturdy sub base for planting of vegetation, with significantly less carving on the topside. I just cut along each side of the groove with a big disposable knife, and rock a chisel bit through to clean out the cross-member grooves:
One example of where I needed the foam to lay down low:
I am running a highway along the backdrop here with a couple of highway overpasses to conceal the tracks where they dive into the backdrop. Tree foliage is my friend all over the layout to hide all these transitions. It has been time consuming fitting all the irregular shapes in, but still have more trimming and shaping to get it right. I take cardboard and make templates so that I can overlay it on the foam board, then trace around them to make best use of each sheet. A number of labor hours still needed here to get the contours right, but its nice to see the basic idea finally taking shape:
I need to cut in the truss bridges here so I can envision better on how the riverbank is going to take shape:
Hoping to get all the sections pre-shaped before gluing into place, as I'm not too excited about trying to reshape in confined ares after the fact. Most of the foam is cut and carved with a 3" knife that uses disposable blades. I will follow up with more carving to get as close as possible adjacent to track sections and multiple layering, then follow up with rasps to blend the overall contours. Just shooting from the hip on it all, as this foam stuff is a new concept for me. One thing for others to note, make sure you build your layout with a bunch of right angles to work with instead of abstract.... :)
Sunday, October 4, 2015
May / October Status Report
Been tough finding much spare time, but still have a bit of forward progress to report:
Art visited a few times to help work on the layout, and made more progress on the base foam layers for the peninsula scenery. Thanks Art!
Meanwhile Eugene Yard trackage has been painted / weathered (airbrushed) from both sides of the layout with good old Floquil Rail Brown and Railroad Tie Brown colors. What a difference that makes. I wanted to leave the opportunity to photograph the layout from any angle, so this needed to be done from both sides of the layout before I could install any of the lower deck skyboards. Before I could start any weathering / painting, it was necessary to install mass quantities of Micro Engineering wood sleeper ties on all the yard turnouts, but once on a roll, I ended up pushing through to complete all the layout's missing sleeper ties in numerous locations. A fairly large scale project (think - bags o' stained ties), but not too overwhelming since I could just work on it as I had small time slots to keep moving forward with. Going from switch stands to ground throws was a last minute observation for Eugene Yard after photo study (not much available on the internet back when I started handlaying turnouts, and friendships with data have helped immensely), so converting them for proper tie placement has been stretching things a bit for me...
Large sections of the layout's trackage had already received painting, so additional locations that received painting after sleeper tie installs, included virtually any trackage left that I could get access to, which did not have rolling stock stored on it.... Remaining track sections still needing to get painted will be done once I complete the current phase of the skyboard install project, as this will allow me to relocate rolling stock to the completed areas.
Lower deck skyboards have been put off extensively in hopes of being able to match detailing to the represented locations on an actual workbench, but I have finally given up on the idea, as it should not be too difficult to complete backdrops in place before pushing ahead too far with adjacent scenery. I cut all sheets of masonite for the skyboards to approx dimensions ahead of time, and painted the lower level's blue shade before install. All sections were furred out with 2x2s to hide upper deck shelf brackets:
A different approach to mounting the backdrop sections:
Eugene Yard played nice for being able to utilize sweeping radius of the masonite for the backdrop corners:
Springfield - disarray of structure placement due to backdrop project:
That big hole on the last image gets a highway overpass to mask the opening. Not sure what to stick in the corner to hide that 90 deg angle... but typically the layout is making use of dense clusters of Conifers to hide most of these backdrop joints.
Once the remainder of trackage is painted, the remaining sections for lower deck skyboards (that have also been prefabbed), will go in at the entrances to Staging, the Return adjacent to Springfield, and Hampton.
Upper deck skyboards have also received multiple attempts of patching screw holes and repainting since their first appearance, and have been rehung again sporting their same high altitude shade of blue. I have styrene backdrop sheets pre-cut for mounting directly on the remaining two wall sections for the upper deck eventually, but they still need some degree of painting and detailing (due to pine trees already in place) before then. Once I am ready to revisit for detailed painting on backdrops, I anticipate a production run effort to complete all similar sections in phases to the overall project. yya...
The layout endured some minor damage to the mainline at W. Natron during the backdrop install project, so repairs on that are nearly complete except for running a test train or two, and matching adjacent track weathering.
If I dont lapse too bad, the layout has a chance of seeing some good scenery progress before the bi-annual SoCalOps meet here next June.
Since we missed the last ops due to this ongoing skyboard project, I am anticipating we will be back on schedule for the Oct Ops Sess at the end of the month, but moving trains around have found a few minor repairs needed (a wire splice that never got soldered and is now intermittent at Irving, completion of the repairs at Natron, and another dead spot that needs to be looked into at Portland yard). Unfortunately no time for further implementation of the revisions to the SP's CS-1306 and CS-1307 forms (conductors work / industry reports) paperwork, but that is on the priority list to get us closer to Espee style Ops...
Cant sign off without a departing shot of the current state of E. Eugene Yard, sporting a string of the new Wheels O' Time Espee bulkhead flats!
Friday, July 17, 2015
So I scratchbuilt my Eugene yard full of code 40 turnouts, with a design that got rid of that oversized throwbar we have all become accustomed to. Hopefully when I get far enough along, Proto:87 will still have their turnout details for N scale to complete the point bars. Here is a proto image by Thom McAdams of a switchstand / throwbar arrangement on a single extended tie depicting a typical SP common standard:
Another image can be found at:
http://www.proto87.com/product1905.html
Note the throwbar is basically just a rod to the point bars, and is not some huge tie sized plate (that is sandwiched between two adjacent ties), moving the switch points back and forth.
In-progress shot of my SP common standard installation:
Well that is all fine for branch related trackage, but then news comes along that the SP had a whole different way of doing things at their Eugene Yard. Ron C sent some images to me that depict a completely different configuration than when I had started the project... this is an image of an old SP "V" plate switch configuration provided by my friend Mike O:
I've been cleaning up loose ends on layout trackage in preparation for a mass weathering campaign, but now I have to deal with this revelation that recently came to light.
These were designed as a Variable Switch, where the switch crew could drive into the switch opposing the switch points from either side, and push the switch points to either side where the turnout would remain in the last traveled position. Unfortunately this configuration used two ties for the ground throw (instead of switchstand), and now I am stumped on how best to recover from this revelation of data.... Here is a sample of my after-the-fact tie placement, but I dont like it:
One solution is to go back to a switchstand.... but not proto at this yard. :(
Currently mulling over the lack of options...
Sunday, April 5, 2015
Cascade Sub Ops Sess Changes, and Update
No Ops on the RR since last.... June. Wow, didn't realize it took that long to get the new business location up and running. Last time I even had time to work on the RR was when John and Chip came over to help around xmas. Now that our shop is open for business, I am able to resume work on many things around the house, including the RR. As preparations were being made for our first ops sess of the year, news came that our signalling / communications engineer had been hospitalized. We are all trying to remain optimistic on a speedy and thorough recovery. Intent is to start ops on a regular bi-montly schedule (on the same day of month), from a revolving call list order so that I have less coordination to deal with, and crews can either sign up ahead, or wait for a harassing call during the interim.
Issues with sound decoder stability, and a rare intermittent false overload issue (since rewiring some of the power distribution sections), were mostly resolved due to a mis-wiring issue in the staging yard, as well as the installation of a new 8 amp power supply... Time will tell, but preliminary testing appears quite optimistic.
I have installed all the remaining sections of curtain, except for a few that still need a bit of finish trim work. To complete the look from layout height down thru the floor, I am finally filling in the remaining cushioned floor tile sections that were 45 degree angle cuts and partial sections. This just seals the overall black finish look, which Im having a hard time getting pics of due to the black colors lacking any detail.... it looks pretty sweet (IMHO).
edit- phone pic added
Eagerly awaiting the release on Wheels of time Flats, Bulkead Flats, and their most recent announcement, the Evergreen PC&F Evergreen boxes (woo hoo). The MT SW1500 should be out any time now, and looking forward to doing a tug-o-war with one of those and our modified tungsten LL SW1200 yard goat.
Looking out the back door of our shop, is a bit of mainline action, and bagged this phone pic of the Oakland one afternoon:
Thats the shop down below in the right corner. That shot made me do a double-take with that kids face on the container behind the power... Regular traffic passing by with a step out the back door, is currently down to the daily Rock train (with three sets of distributed power throughout), the Oakland, Saugus Local, and boring parade of commuters. Hopefully traffic picks up again soon.
Back to work on the SP Oregon Division. :)
Issues with sound decoder stability, and a rare intermittent false overload issue (since rewiring some of the power distribution sections), were mostly resolved due to a mis-wiring issue in the staging yard, as well as the installation of a new 8 amp power supply... Time will tell, but preliminary testing appears quite optimistic.
I have installed all the remaining sections of curtain, except for a few that still need a bit of finish trim work. To complete the look from layout height down thru the floor, I am finally filling in the remaining cushioned floor tile sections that were 45 degree angle cuts and partial sections. This just seals the overall black finish look, which Im having a hard time getting pics of due to the black colors lacking any detail.... it looks pretty sweet (IMHO).
edit- phone pic added
Eagerly awaiting the release on Wheels of time Flats, Bulkead Flats, and their most recent announcement, the Evergreen PC&F Evergreen boxes (woo hoo). The MT SW1500 should be out any time now, and looking forward to doing a tug-o-war with one of those and our modified tungsten LL SW1200 yard goat.
Looking out the back door of our shop, is a bit of mainline action, and bagged this phone pic of the Oakland one afternoon:
Thats the shop down below in the right corner. That shot made me do a double-take with that kids face on the container behind the power... Regular traffic passing by with a step out the back door, is currently down to the daily Rock train (with three sets of distributed power throughout), the Oakland, Saugus Local, and boring parade of commuters. Hopefully traffic picks up again soon.
Back to work on the SP Oregon Division. :)
Subscribe to:
Posts (Atom)





















