Added a Page with a short How-To article on adding resistors to your rolling stock. Get that DCC train with detected wheel sets together, because yes, you are welcome to run it here for Opp Sessions. Already looking forward to our first BYO Equipment Night.... :)
Direct link to the page:
Detected Wheel Sets
Image above captured on the upper deck of the layout where scenery has progressed to some extent...
Shot with Olympus C-750
Welcome to the SP Oregon Division!
An N Scale RR depicting the good old days along "The Friendly".
Shot with Olympus C-750
Welcome to the SP Oregon Division!
An N Scale RR depicting the good old days along "The Friendly".
Saturday, June 2, 2012
Sunday, May 6, 2012
Updated "Insight on Operations"
Spent the last few weeks getting the layout ready for its first official operating session since putting the Staging Yard into service. Paperwork was more than I wanted to deal with, but on the verge of completion now. Updated the "Insight on Operations" pages in the "Espee Oregon Division Pages" section to reflect all the changes. Of note is some changes that Blogger has made to their pages recently. Now you have to right click on an image after opening it, then click "view image" to see it full size... wtf? Anyhow, here is a direct link to the page:
Insight on Operations
Among the new changes, added some trains including a Cabhop, a Hauler Job, a second (Night) Weyerhauser Job, and restored one of the monster empty lumber drags. Biggest change is the complete overhaul to how Eugene Yard handles traffic. The new lumber mill is now also in service so the Oakridge turn now handles a bit more switching chores.
Insight on Operations
Among the new changes, added some trains including a Cabhop, a Hauler Job, a second (Night) Weyerhauser Job, and restored one of the monster empty lumber drags. Biggest change is the complete overhaul to how Eugene Yard handles traffic. The new lumber mill is now also in service so the Oakridge turn now handles a bit more switching chores.
Friday, May 4, 2012
BLMA 100 Ton Trucks Added to Chip Gon Fleet
Since the new lumber mill will be shipping cars soon here, I had to prepare more woodchip gondolas so they could be put in service. Recently I acquired a number of Deluxe Innovation Chip Gons with some really nice loads already added (Thanks Arnold!). So after my last visit to Kel's place and admiring how easy it was to add body mount couplers and BLMA trucks to these cars, it was time to add the upgrades to my cars here. MT 1015 couplers in bulk are cheap, and with the plastic underframe it is easy to drill and tap the mounting. With the BLMA 100 ton trucks under them, there is no need to shim the 1015s for a perfect ride height. I hated to put resistors on such nicely detailed wheels, but fortunately no one has ever made note of seeing a resistor on any of
my rolling stock to date... so after adding a detected wheelset to each car, it was a
real breeze to complete the dozen additional cars needed for service.
Here is a comparison shot of the Deluxe GEBC "Ace" chip gons with the BLMA 100 ton trucks on left, and MT RB trucks with FVM 36" wheels on right. The newly modified car appears to have too low a coupler height when comparing to the other car, but this is mostly due to the fact that the MT talgo trucks have the 36" wheels installed, making the ride height higher than normal on those cars. The car's new ride height difference is striking.... these things look sweeet!
Another shot but of a Deluxe Gunderson Deep Rib gon for comparison. I have body mounted some of these before, but never with the addition of the BLMA 100 ton trucks. Not quite as straight forward of a mod, but by using the 1025 coupler, it is basically just a matter of filing the end sill to make room for the coupler box to fit up snug to the underfame. Well worth the time to get the better ride height, as these cars never looked quite right until lowering them down this far.
Still a few more chip gons on the layout that need the upgrade treatment, but will go back and revisit the ongoing body mount project (yet again) not far down the road.
About 50 cars have been added to the layout to balance out operations with the new mill, and trains that have been reconfigured since the addition of staging. Been slowly adding more resistors to wheels and am down to the last few cars that need to be completed for the next run. Had a number of inquires on how I put on the resistors, so working on an overview in "My Pages" section with some snapshots on my methodology making detected wheelsets. Maybe some ideas others would be interested in... stay tuned for that one.
Sunday, March 25, 2012
Expansion Phase II Commissioning
Last weekend we were able to have a real loose operating session to drive the layout hard and find out how things performed with the new Staging addition. Ray threw a lot of weight into getting the signaling installed and reconfigured, and deserves his usual pat on the back for what many take for granted regarding the intricacies of installing CTC on the railroad. Staging has made a dramatic change to how the layout flows now, and appears to have reduced the overload problems that my Eugene Yard had been bogged down with.
It looks like things are fairly solid since we ironed out a few minor details, but I still need some more feedback from operators on how the staging flows (regarding arrivals and departures). Looks like I might have to add more dreaded paperwork to the General Rules on how operators are to handle staging, as it is not as seamless as I had hoped. There is a bit of confusion on trains arriving at their destination name (for ex Portland), but then pulling the train the rest of the way into the staging yard leaves the head end at the opposing name location (ex Klamath Falls), so crews are not clear on which yard office handles the paperwork. I suppose just a minor glitch that seasoned operators will never think about, but I want to simplify things for new operators so as not to drown them. Hoping for more operator suggestions on how to deal with it on a simplistic level as they encounter it first hand...
Still more work ahead before any official crew calls go out again, but once I can get a grip on the loose ends (adding related cars, associated paperwork, etc), we will schedule accordingly.
The next session will surely unveil some more items that need attention, but I plan with each future session to expand on train assignments in an effort to fill out operations, and also to make car flow even more a part of the railroad, as opposed to just moving the trains.
Hoping to move toward adding more scenery over the next few months....
It looks like things are fairly solid since we ironed out a few minor details, but I still need some more feedback from operators on how the staging flows (regarding arrivals and departures). Looks like I might have to add more dreaded paperwork to the General Rules on how operators are to handle staging, as it is not as seamless as I had hoped. There is a bit of confusion on trains arriving at their destination name (for ex Portland), but then pulling the train the rest of the way into the staging yard leaves the head end at the opposing name location (ex Klamath Falls), so crews are not clear on which yard office handles the paperwork. I suppose just a minor glitch that seasoned operators will never think about, but I want to simplify things for new operators so as not to drown them. Hoping for more operator suggestions on how to deal with it on a simplistic level as they encounter it first hand...
Still more work ahead before any official crew calls go out again, but once I can get a grip on the loose ends (adding related cars, associated paperwork, etc), we will schedule accordingly.
The next session will surely unveil some more items that need attention, but I plan with each future session to expand on train assignments in an effort to fill out operations, and also to make car flow even more a part of the railroad, as opposed to just moving the trains.
Hoping to move toward adding more scenery over the next few months....
Sunday, February 12, 2012
Lumber Mill and Stage II Progress
Latest project was the building and installation of 3 more code 40 turnouts for the lumber mill trackage, and pushing through on completing the rest of the trackwork there also. Just a bit more wiring and this industry should be ready to receive it's first cut of cars in conjunction with the inaugural ops of the new layout configuration. It's as close as I could get with selective compaction for my version of Pope Talbot. The trackage arrangement is close comparing the SPINS diagram to years gone by (minus one track), but I don't have the real estate for accurate structure placement. I have a temp structure set-up for now until I can get more info on how it looked vs what I have to work with.... then these stand-in structures should eventually move to the proposed Klamath Northern Gilchrist mill location on the upper deck of the expansion.
Looking out the West end of Oakridge:
Meanwhile also got both temp staging yard panels installed. They don't show exact track alignment as it made the ladders appear a bit confusing, so this is kind of a test for the permanent panels, but want to see how it all flows with emphasis just focusing on the track numbers needed for movements. Staging will be where those new to the operations will board their first run, and I'm hoping to make it as seamless as possible just to get the feel of the layout, without being submerged into the intricacies of full ops...
Here is a view of Portland Panel with arrival / departure's break down. Note the 5 throttle slots are typically for the corresponding 5 departure tracks (top of control panel board is visible here also):
So now that all track feeders have been finished and all Tortoise wiring is completed for Phase II expansion, it was time to run the first test train through the staging yard!
A 45 car MT lumber drag pulls out of Klamath Falls after a run through into Portland and "through" the staging yard for testing:
....only a few minor issues. Once I added a few more feeders and filed some switch points it appeared to be pretty seamless running both ways through the yard with the first test train. Got it wired now temporarily to run trains and verify the flow, as the booster and associated wiring for block detection etc is still progressing. The DB150 Booster will sit on the shelf behind the new control panel board installed under the Portland yard location. Work still progressing on the front of the panel board which will carry the support for the DB150 (power districts) and detection / signaling related devices. Have progressed most of the way through on the Loconet connections for the new throttle racks and booster. All throttle racks have been tested and are up and running...
Klamath Falls Panel and Throttle Rack:
...but not without issue. After installing the new throttle ports around the addition, we tied it into an existing UP5 with it's own PS, but the system failed to power the throttles with the DCS turned off. After putting the LT5 tester on the output jacks of the UP5 we found that it was wired different than the schematic included with the Digitrax user manual... The side port output was wired with the LocoNet rear jacks rather than to follow the front Throttle jacks! No evidence of this found anywhere on the web or otherwise from anyone else, but that is what it was. So Ray modified the UP5 circuit board for pin 6 output to configure it as per the user manual drawing, and it all works perfect now!
Optimistic the signaling gets integrated into staging soon so we all can resume our erratic schedule of Ops... :)
Sunday, January 22, 2012
Staging Completion on the Horizon
Hit a few milestones over this past week...
-All of the trackage has now been installed in the staging yard, but still have to block all the sections, and finish dropping feeder wires... I anticipate being able to complete that soon. I read a trick about using ACC to glue the sliding rail to the ties before cutting any gaps in the Atlas flex track, so hoping that a test of that will be successful and I won't have to worry about any kinks in the rail where cutting gaps on the radius curves...
-Basic Tortoise motor installation is now complete at both ends of staging, but a bit more wiring to go. Edge connectors are working out really nice, and a must if you don't want to spend a bunch of time under the layout soldering wires. We took old edge connectors and cut them in half, then glued in styrene strips to keep them aligned properly when installed on the tortoise motors.
Ray and I installed and tested the first Matrix Board to control the yard ladder at the Portland end. The boards that he built are from a design that Rob Paisley designed and can be found at Rob's Web Page (this guy has a lot of info for other projects at his home page also), and are a huge leap forward from the old ways of using the diode steering with ice cube relays... this is just cool:
Basically I just chopped out a short section of the lower track in the helix, and brought the remaining ends out on new roadbed where they connect to each end of the staging yard leads. Maximum gradients are still well below max as well as minimum radius curves on this addition. A view departing Klamath Falls staging end:
There will be a scenic divider between the two yard ends where I will make an attempt to separate them visually... There won't be much in the way of scenery here other than some ballast, a couple yard structures, and maybe painting the backdrop / divider to simulate the feel of appropriate yards.... 6" above the new bridge elevation will be another deck (the next phase), so this should also help to force viewing the mini-yard scenes from an acceptable perspective. Once arriving trains flow through the yard leads into the yard tracks they will disappear under the bench-work of the other deck also.
Still haven't been able to run the first test train through the staging yard trackage yet, but looks like we are getting pretty close now.
-All of the trackage has now been installed in the staging yard, but still have to block all the sections, and finish dropping feeder wires... I anticipate being able to complete that soon. I read a trick about using ACC to glue the sliding rail to the ties before cutting any gaps in the Atlas flex track, so hoping that a test of that will be successful and I won't have to worry about any kinks in the rail where cutting gaps on the radius curves...
-Basic Tortoise motor installation is now complete at both ends of staging, but a bit more wiring to go. Edge connectors are working out really nice, and a must if you don't want to spend a bunch of time under the layout soldering wires. We took old edge connectors and cut them in half, then glued in styrene strips to keep them aligned properly when installed on the tortoise motors.
Plug and play. :) Well, still have to run the frog feeder wires to the turnouts...
Ray and I installed and tested the first Matrix Board to control the yard ladder at the Portland end. The boards that he built are from a design that Rob Paisley designed and can be found at Rob's Web Page (this guy has a lot of info for other projects at his home page also), and are a huge leap forward from the old ways of using the diode steering with ice cube relays... this is just cool:
It was a smooth install with the terminal blocks mounted on the boards, as they were quick to terminate the field wiring and verify correct orientation for normal and reverse turnout positioning. Excited how nice the matrix controls are working at this point. Special thanks to Ray as he has spent a number of hours researching and building these matrix boards for the layout, as well as helping on the install. The control board for the K-Falls end of staging is also completed and here now awaiting its turn to be installed. I still have to make up more temporary panel displays (just using foam board for now) to mount the push button switches on so crews can follow the ladder diagrams, but they are all wired and ready to be installed into the panels. This will get us back to operations again until I figure out what the final panel designs will be for all the yard panels on the layout...
-Each yard throat end is now connected to the helix also. Here is a view looking away as departing from the Portland Staging end:
Basically I just chopped out a short section of the lower track in the helix, and brought the remaining ends out on new roadbed where they connect to each end of the staging yard leads. Maximum gradients are still well below max as well as minimum radius curves on this addition. A view departing Klamath Falls staging end:
Still haven't been able to run the first test train through the staging yard trackage yet, but looks like we are getting pretty close now.
Thursday, January 12, 2012
Belated Staging Progress Report
Busy pushing forward on the staging phase of the expansion as of late. Both yard ladders have been laid at the east and west "ends" repsectively. Since the layout is actually a loop, the staging is designed to sever that loop creating a West end (Klamath Falls), and an East end (Portland) for trains originating and departing. This design allows visibly loaded (or empty) trains to continue to operate in the proper direction between runs, without having to turn trains. Holding the coarse, installation of switch machines aka Tortoise motors is complete at Portland, and progressing through installation at Klamath Falls now. I am looking forward to the use of edge connectors for terminating wires to the contact strips, unlike what has previously been done.
Ray has already built the first Matrix board which is ready for the Portland Yard throat's nine Tortoise motors (more on that when it arrives on scene). This railroad is already years ahead of where I would have it if not for Ray... that means thanks yet again Ray! Mulling over the yard throat panel designs... Preliminary thoughts are to have two sets of 5 push buttons on each panel for aligning specific staging tracks, one set for (5) arrival and the other for (5) departure at each end of the staging yard.... probably based on track numbers instead of a track diagram, and to be located right below each yard throat. Orders will dictate track number where crews board trains or tie down, and should help to alleviate having to hunt and peck correct turnout positioning.
The final track diagram has been transposed to the benchwork between "ends", and the track gang has commenced laying the Atlas 55 flex trackage as well. Don't really like how one rail flops around in the tie spikes, but it is what it is... I am also still trying to adjust to the spring action of Atlas flex vs the ME flex, as it is not as user friendly where there is a flex end section on an imcompleted curve... fortunately the choice of contact cement is making things workable... just do not use the heatgun trick on this track as it has a lower melt point than ME also... A progress shot looking at Portland Yard taken yesterday and already outdated:
The shelving / structural support is now completed under the staging yard. This gives each "end" of the layout a Yard Office for originating and terminating crews. This includes throttle storage racks, and train assignment pockets for crews with associated paperwork. In addition there is now supplementary storage space for crews that need a place to lay forms, radios, throttles, or beverages (instead of those inviting flat areas with finish scenery), accessible from almost any location around the layout.
A view overlooking the entrance to Portland end and it's Yard Office below (short section just to left of throttles is where the yard panel will reside):
Progress at Klamath Falls with it's Yard Office (yard panel will be just to the right of the throttle tray here):
A third Yard Office location also has all the above opposite Eugene Yard for crews and Hostler there. It all gets painted black eventually to blend in with the motif, which will include more of the same fascias and curtains.
Throttle storage racks are 5 gang holders which will house a connection to Loconet in case of needed programing, and also to keep throttles powered (as a battery save mode) between sessions. Eventually all staging throttle slots will be labeled with departing track numbers so crews can easily find their train as associated with their clearance / orders in adjacent Assignment Pockets. Conventional throttle pockets that are currently mounted on the fascias around the layout will remain.
Assignment Pockets follow the existing operating plan that will be modified following the sequence of train assignments that has already proven itself as a stable call system for originating trains. Clearance Cards with originating Train Orders on the top shelf, with terminating orders placed below. Typically crews that are still available for Hours of Service, will draw their next set of orders from their terminating destination, similar as any crew would return back on their district. We will include some orders that will direct crews to take a "Carry All" to Eugene for filler assignments as needed.
Already got the concept in my head, but really itching to see how incorporating the staging into the layout changes traffic flow, then I can move forward on modifications to the operating scheme. :)
Ray has already built the first Matrix board which is ready for the Portland Yard throat's nine Tortoise motors (more on that when it arrives on scene). This railroad is already years ahead of where I would have it if not for Ray... that means thanks yet again Ray! Mulling over the yard throat panel designs... Preliminary thoughts are to have two sets of 5 push buttons on each panel for aligning specific staging tracks, one set for (5) arrival and the other for (5) departure at each end of the staging yard.... probably based on track numbers instead of a track diagram, and to be located right below each yard throat. Orders will dictate track number where crews board trains or tie down, and should help to alleviate having to hunt and peck correct turnout positioning.
The final track diagram has been transposed to the benchwork between "ends", and the track gang has commenced laying the Atlas 55 flex trackage as well. Don't really like how one rail flops around in the tie spikes, but it is what it is... I am also still trying to adjust to the spring action of Atlas flex vs the ME flex, as it is not as user friendly where there is a flex end section on an imcompleted curve... fortunately the choice of contact cement is making things workable... just do not use the heatgun trick on this track as it has a lower melt point than ME also... A progress shot looking at Portland Yard taken yesterday and already outdated:
The shelving / structural support is now completed under the staging yard. This gives each "end" of the layout a Yard Office for originating and terminating crews. This includes throttle storage racks, and train assignment pockets for crews with associated paperwork. In addition there is now supplementary storage space for crews that need a place to lay forms, radios, throttles, or beverages (instead of those inviting flat areas with finish scenery), accessible from almost any location around the layout.
A view overlooking the entrance to Portland end and it's Yard Office below (short section just to left of throttles is where the yard panel will reside):
Progress at Klamath Falls with it's Yard Office (yard panel will be just to the right of the throttle tray here):
A third Yard Office location also has all the above opposite Eugene Yard for crews and Hostler there. It all gets painted black eventually to blend in with the motif, which will include more of the same fascias and curtains.
Throttle storage racks are 5 gang holders which will house a connection to Loconet in case of needed programing, and also to keep throttles powered (as a battery save mode) between sessions. Eventually all staging throttle slots will be labeled with departing track numbers so crews can easily find their train as associated with their clearance / orders in adjacent Assignment Pockets. Conventional throttle pockets that are currently mounted on the fascias around the layout will remain.
Assignment Pockets follow the existing operating plan that will be modified following the sequence of train assignments that has already proven itself as a stable call system for originating trains. Clearance Cards with originating Train Orders on the top shelf, with terminating orders placed below. Typically crews that are still available for Hours of Service, will draw their next set of orders from their terminating destination, similar as any crew would return back on their district. We will include some orders that will direct crews to take a "Carry All" to Eugene for filler assignments as needed.
Already got the concept in my head, but really itching to see how incorporating the staging into the layout changes traffic flow, then I can move forward on modifications to the operating scheme. :)
Subscribe to:
Posts (Atom)